Waste Heat Recovery System Installations
Location: Battle Creek, MI and Kalamazoo, MI
Customer Challenge: Area paper manufacturer was looking for a reduction in manufacturing costs through energy savings. For corporate approval, a short payback period was required.
Solution: Option was available to utilize the boiler high flue gas temperatures through a Condensing Economizer to heat water for Boiler Feedwater and to cycle back to their manufacturing process, thus significantly reducing their natural gas usage. Monarch worked closely with equipment manufacturer, engineering firm and plant personnel to plan pipe routing, equipment and platform installation, etc. Contract value $1.3 million per site each having investment payback of 2 ½ years.