Design Build Pump Building Addition

Location:  Southeast, MI
 
Customer Challenge:   Client on a schedule and cannot procure building addition within outage time frame.
 
Solution:  Monarch met with client to document what the building needs were and went directly into design build mode. Engineers worked systematically through the requirements and produced drawings for the fabrication in an as needed, just in time scenario. We were able to meet the timeline while giving the client exactly what he needed for the price that he appropriated.