Duct Support & Structural Package

Location:  Detroit, MI
 
Customer Challenge:  Installation of duct work throughout and over the existing buildings that were never designed to accommodate the additional weight and loading.
 
Solution:  The Iron Work Division reinforced existing steel as required, and installed supplemental and new structural as required for the duct runs from process to process. Part of the issue was reaching 135’ onto the roof and 125’ across the roof.  Special rigging and crane were used.